APP Secures New Contract for Ras Hayyan Infrastructure Development – Nov 2025
Alsaad Power Projects is proud to announce the signing of a new […]
Employee of the Q2- 2025
APP has decided to introduce the “Employee of the Quarter” initiative from […]
Employee of the Q1- 2025.
APP has decided to introduce “Employee of the Quarter” initiative from the […]
220kV/66kV Works- Al Ramli BSP-Eskan Ramli
33kV Substation Design & Build at ALBA, Client COMSIP – ABB
66kV Transmission Project- 66kV & 11kV Termination & Testing Works
66kV Transmission Project- 66kV & 11kV Termination & Testing Works. Client – […]
Installation of 220kV GIS at ALBA SH9 Substation for PS5 Block 4 Site
Installation of 220kV GIS at ALBA SH9 Substation for PS5 Block 4 […]
South loop Bahrain Road Project
South loop Bahrain Road Project, Client – Eastern Asphalt
E & I Installation works at Al Madinah Al Shamaliya STP Project
E & I Installation works at Al Madinah Al Shamaliya STP Project […]
Design & Build New Substation and Implanting at Bahrain International Airport
Design & Build New Substation and Implanting at Bahrain International Airport. Client […]
FOC and Control Cable pulling at Bahrain International Airport- New Expansion Project-Phase 3
FOC and Control Cable pulling at Bahrain International Airport- New Expansion Project-Phase […]
33kV Substation Design & Build at ALBA
33kV Substation Design & Build at ALBA, Client COMSIP – ABB