Dept | Client / Consultant | Project Name | Description of works | Project Period(Approx) |
---|---|---|---|---|
Civil | Bahrain Airport Company | Refurbishment Works at Arrival Façade | Galvanized steel framing, cement board cladding and painting | 2 months |
EHV | EWA (Projects) / ESBI. | Amazon Web Services Development Project | 66kV Joint Bay Preparation, including Excavation, Backfilling, Termination, Jointing & Testing of 66kV Circuits – and 48 Fiber Optic Cable termination and Jointing & testing works | 8 months |
ETD – EWA | 33kV Diversion work at Salmaniya Avenue Project | Rerouting of 33kV circuit (app 400m) along King Abdul Aziz Ave and Salmaniya Ave, including excavation, backfilling, preparation of trenches, major road crossing and 33kV / 61 pair pilor cable laying, 33 kV Joint bay Preparation, and 61 Pilot cable joining works. | 1 month | |
EWA – ETD / SNC Lavalin | 66kV Diversion work at Alba Nuwaidrat Interchange (Circuit Riffa Huneniyah 66kv) | Rerouting of 66kV circuit (app 800m) along Al Muaskar Hwy & Riffa 66kV Substation including preparation of cable trenches, excavation, backfilling, 66kV & 61 pair pilot cable laying, 66 kV Joint bay Preparation, jointing & testing. | 1 month | |
SAUDI CABLE/SIEMENS | ALBA Line 6 Expansion Project – Power Distribution System Cable laying project | *220 kV ,132kV , 33 kV , 11 kV , LV , FOC & Control Cable Laying app 120Km * Installation of steel supports *Related Resting and commissioning *33kV & 11 kV Termination & Jointing |
10 Months |