We are proud to announce the contribution of APP to the Riffa Power Station (GTA-6 & GTA-8) with ILJIN ELECTRIC CO. Korea, for the replacement of 220KV, 80 MVA with 220KV, 100 MVA generator transformers.

The transformer replacement project was launched on January 20, 2014 at Riffa Power Station, and includes customs clearance, transportation of 2 No. of 220KV, 100 MVA transformers, accessories and insulation oil from Sheikh Khalifa Port to Riffa Power Station.

The major part of the work consisted of dismantling two 80 MVA existing transformers and accessories including oil draining, and the same is reassembled in the storage yard provided by the client.  The two new 100 MVA generators transformers and accessories were installed over the existing foundation and the vacuum, oil filling, oil filtration, and site tests were conducted as per the standard specification.

The above works included the testing of existing foundation, redesigning and ultrasonic thickness tests of fire fighting system.

As all APP members are commended for their hard work and dedication to achieve successful results; this project marks a significant milestone for APP’s growth and development within the energy sector.

Abdulrahman Ali Al Saad Power Projects Co. W L L (APP) is an Electrical, Civil and Mechanical Contracting Company based in Bahrain since 2006.  APP offers varying specialized services to the Electricity and Water Authority of Bahrain, as well as major Private Sector contractors, for infrastructure development projects. 

Contact Us

Flat 408, Bldg. 178, Road 907,
Block 309, Gudaibiya,
Manama, Kingdom of Bahrain.
Connect Us
T: +973 17273330
F: +973 17273331
E: info@alsaadprojects.com

Website QR Code

ISO Certifications

© 2025 · Abdulrahman Ali Al Saad Power Projects Co. WLL

Made in Bahrain By DeVerra Technologies.

This is a staging enviroment