We are proud to announce the contribution of APP to the Riffa Power Station (GTA-6 & GTA-8) with ILJIN ELECTRIC CO. Korea, for the replacement of 220KV, 80 MVA with 220KV, 100 MVA generator transformers.
The transformer replacement project was launched on January 20, 2014 at Riffa Power Station, and includes customs clearance, transportation of 2 No. of 220KV, 100 MVA transformers, accessories and insulation oil from Sheikh Khalifa Port to Riffa Power Station.
The major part of the work consisted of dismantling two 80 MVA existing transformers and accessories including oil draining, and the same is reassembled in the storage yard provided by the client. The two new 100 MVA generators transformers and accessories were installed over the existing foundation and the vacuum, oil filling, oil filtration, and site tests were conducted as per the standard specification.
The above works included the testing of existing foundation, redesigning and ultrasonic thickness tests of fire fighting system.
As all APP members are commended for their hard work and dedication to achieve successful results; this project marks a significant milestone for APP’s growth and development within the energy sector.