ELECTRICAL PROJECTS
- Alba Line 6 PDS Project | Client: ESBI / SIEMENS/Saudi Cable Company 220 kV, 132kV, 33 kV, 11 kV, LV, FOC & Control Cable Laying | Installation of steel support Related Testing and commissioning | 33kV & 11 kV Termination & Jointing Fire coating & Fire sealant works
- Civil,Electrical & Mechanical works for security camera installation at GPIC Client: G4S/GPIC Excavation, Foundation construction,cable laying, mechanical tower installation, pole installation, panel installation, camera installation and related MEP civil works.
- Electrical Installation Works at Sewage Treatment Plant, Al Shamaliya Island | Client: WABAG/MWH KHONJI Erection Works of MV panel, MV Cable, LV Panel, UPS, Battery, Ring Main Unit Panel, Cable Tray, Transform at various substation and Utility buildings. Cable Tray, Termination, Earthing and building Electrical Lighting works from Terminal Lift Pumping Station (TLPS) till Treated Sewerage Effluent (TSE)
- HV & LV Trench Excavation Woks – TATWEER | Client: Ray International Trench excavation, laying of 11KV / LV Cables at Tatweer Petroleum Oil Fields development projects
- 80 TPH Clinker Grinding unit extension at Hidd | Client: Ultra Tech Cement Installation and Commissioning of MV/LV Electrical equipment | Instrumentation works | Industrial wiring and cable tray installation.
- Amazon Web Services Development Project | Client: EWA (Projects) / ESBI 66kV Joint Bay Preparation, including Excavation, Backfilling, Termination, Jointing & Testing of 66kV Circuits – and 48 Fiber Optic Cable termination and Jointing & testing works
- Replacement of Generator Transformer | Client: Iljin Electric Co Korea/ EWA(ETD) Replacement of 2nos 80MVA,220kV with 2nos 100MVA,220kV Generator Transformer at Riffa Power Station. Installation, Testing and Commissioning
- 66kV Transmission Projects/ Phase 1&4 ,66kV & 11kV Termination and Testing Works | Client: GE/ESBI/EWA 66kV & 11kV Cable termination works Bentonite filling & Duct ceiling 66kV & 11kV Testing works
- Design & Built of 33kV substation at Alba | Client: COMSIP/ABB Architectural and Structural works as per ALBA standard including Painting, Fire Proofing, Ceiling, Flooring, mechanical works. – Turnkey
- 66kV Transmission Projects/Phase 2 -66kV & 11kV Termination and testing works | Client: GE/ESBI/EWA 66kV Termination,11kV Termination, 66kVTesting and 11kV testing
CIVIL CONSTRUCTION PROJECTS
- 7 Storey Residential Building at Hoora Client: Mr. Abdulredha Ali Mohammed Haqiqi
- 5 Storey- Commercial and residential building at Al Qadam Client: Mr. Abdulhassan Buhussain
- 2 No’s 3 Storey Building at Juffair – Client: Mr. Abdulla Al Sammak
- 3 Storey Commercial & Residential building at Manama Client: Mr. Abbas Abdul Jabbar Ghuloom Zainal
- 3 Storey- building at Isa Town – Client: Mrs. Fawzeya Ahmed Abdulla
- 3 Storey Building at Manama – Client: Asia Trading
- 2 Storey Commercial Building at Askar – Client: H.H.Sh. Khalifa Salman Mohamed Salman Al Khalifa
- Security Administration Multi Storey Building at Client: BANAGAS
- 7 Storey Commercial Building at Al Muqsha – Client: Mr Huda Mahmood
- Country New Office Building Muharraq | Client : DHL